Propuesta de mejora con un sistema de supervisión en la planta de triturado de piedra de la empresa TRITURADORA BOCAS DEL GUAYURIBA S.A.S
dc.contributor.advisor | Cruz-Guayacundo, Wilmer |
dc.creator | Duran-Moreno, Braider Liniker |
dc.date.accessioned | 2023-08-10T16:45:47Z |
dc.date.available | 2023-08-10T16:45:47Z |
dc.date.created | 2023-02-01 |
dc.identifier.uri | http://repositorio.uniagustiniana.edu.co/handle/123456789/2163 |
dc.description | Actualmente, la empresa no tiene la posibilidad de monitorear el estado general de la planta, lo que ha llevado al personal a manejar únicamente el mantenimiento correctivo, teniendo como resultado, mayor deterioro de los equipos, mayores pérdidas de producción y costos de mantenimiento, baja confiabilidad y disponibilidad de la planta. Esto se debe a que sin la posibilidad de detectar un problema antes de que ocurra la falla, no se puede hacer una intervención estratégica y programada sin que afecte el proceso productivo de la planta. La empresa actualmente no cuenta con indicadores de proceso ni mantenimiento, teniendo en cuenta la información suministrada por los colaboradores, la planta ha estado detenida hasta 3 o 4 días por fallo de algún equipo y por no tener los repuestos necesarios en el momento, esto tratándose de daño en equipos críticos, por ejemplo un motor que sufrió una sobrecarga y sé quemó el embobinado. Aparte hay que tener en cuenta los fallos como desalineación de bandas que puede tomar de 1 a 2 horas la alineación, fallo en un rodamiento que puede tomar de 2 a 3 horas el cambio si se tiene el repuesto, si no se tiene la máquina permanece parada desde él momento del fallo hasta conseguir el repuesto que sería aproximadamente de 8 a 24 horas, él cambio de mallas dura de 4 a 12 horas dependiendo la cantidad de mallas. Estos son algunos de los tiempos de mantenimiento perdidos por falta de un sistema de supervisión que permita observar y analizar el estado de los equipos según variables físicas como temperatura, amperaje, vibración, y así poder intervenir de manera programada sin afectar la producción y no como sé hace actualmente (mantenimiento correctivo). Por otro lado, cabe destacar que estos problemas conllevan a pérdidas financieras para la empresa, se pierde producción por el tiempo de planta detenida, hay aumento de mano de obra interna y externa, los costos de los repuestos y equipos nuevos, entre otros. |
dc.description.abstract | Currently, the company does not have the possibility to monitor the general state of the plant, which that has led the staff to handle only corrective maintenance, having as result, greater deterioration of the equipment, greater production losses and costs of maintenance, low reliability and availability of the plant. This is because without the possibility of detecting a problem before the failure occurs, you cannot make a strategic and programmed intervention without affecting the production process of the plant. The company currently does not have process or maintenance indicators, taking into account According to the information provided by the collaborators, the plant has been stopped for 3 or 4 days due to failure of some equipment and for not having the necessary spare parts at the moment, this 6 in the case of damage to critical equipment, for example a motor that suffered an overload and I know burned the winding. In addition, failures such as band misalignment must be taken into account which can take 1 to 2 hours to align, bearing failure which can take 2 to 3 hours the change if you have the spare, if you do not have the machine remains stopped from it time of the failure until getting the spare part, which would be approximately 8 to 24 hours, he mesh change lasts from 4 to 12 hours depending on the number of meshes. These are some of maintenance times lost due to the lack of a supervision system that allows Observe and analyze the state of the equipment according to physical variables such as temperature, amperage, vibration, and thus be able to intervene in a programmed manner without affecting production and not as I know currently does (corrective maintenance). On the other hand, it should be noted that these problems lead to financial losses for the company, production is lost due to plant time stopped, there is an increase in internal and external labor, the costs of spare parts and equipment new, among others. |
dc.format.mimetype | application/pdf |
dc.language.iso | spa |
dc.rights | Atribución 4.0 Internacional |
dc.rights.uri | http://creativecommons.org/licenses/by/4.0/ |
dc.source | reponame:Repositorio Institucional UniARI |
dc.source | instname:Universitaria Agustiniana |
dc.subject | Mecatrónica |
dc.subject | Automatización |
dc.subject | Sistema de supervisión |
dc.subject | Planta de triturado de piedra |
dc.title | Propuesta de mejora con un sistema de supervisión en la planta de triturado de piedra de la empresa TRITURADORA BOCAS DEL GUAYURIBA S.A.S |
dc.type | info:eu-repo/semantics/bachelorThesis |
dc.rights.accesRights | info:eu-repo/semantics/openAccess |
dc.rights.acceso | Abierto (Texto Completo) |
dc.subject.keyword | Mechatronic |
dc.subject.keyword | Automation |
dc.subject.keyword | Supervision System |
dc.subject.keyword | Stone crushing plant |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion |
Archivos en el documento
Este documento aparece en la(s) siguiente(s) colección(ones)
Esta obra está bajo licencia internacional Creative Commons Reconocimiento-NoComercial 4.0.